| Apparatus Gallery |  |
|
Picture Gallery Print this page
Page: |
1 |
2 |
3 |
4 |
5 |
6 |
 | Heavy fire in the Attic - Second house
|
| |  | Where gettin it!
|
| |  | MABAS Works!
|
| |  | Back of the home
|
| |  | Almost Out!
|
| |  | Fire on arrival!
Dispatched to a reported Garage Fire. Chief on scene pulls MABAS Box 40-2 and reports heavy fire. First due engine pulls in for quick attack and second due engine secures water supply.
|
| |  | Deploying attack lines!
First in Engine deploys a 3" Blitzline to the rear of the house and 2" attack line to the near side. Heavy fire in Garage as extended up the rear of the exterior of the house and extended into the Kitchen.
|
| |  | Lines Charged - Going to Work!
A Compressed Air Foam Attack is made with all lines to the exterior of the building.
|
| |  | Duece and half CAFS line on the Garage
Garage has heavy fireload conditions and provides a difficult fight.
|
| |  | Still heavy fire!
|
| |
Page: |
1 |
2 |
3 |
4 |
5 |
6 |
|
|
| Picture Gallery |  |
| 2010 Call Volume |
| |
Fire |
EMS |
| January |
7 |
18 |
| February |
5 |
11 |
| March |
11 |
13 |
| April |
14 |
12 |
| May |
9 |
9 |
| June |
4 |
12 |
| July |
4 |
12 |
| August |
6 |
11 |
| September |
|
|
| October |
|
|
| November |
|
|
| December |
|
|
| Total |
60 | 98 |
View Call Volume History
|
|