| Apparatus Gallery |  |
|
Picture Gallery Print this page
February 2009 Prairie Pedal Lane Residential Fire Page: |
1 |
 | Deploying attack lines!
First in Engine deploys a 3" Blitzline to the rear of the house and 2" attack line to the near side. Heavy fire in Garage as extended up the rear of the exterior of the house and extended into the Kitchen.
|
| |  | Lines Charged - Going to Work!
A Compressed Air Foam Attack is made with all lines to the exterior of the building.
|
| |  | Duece and half CAFS line on the Garage
Garage has heavy fireload conditions and provides a difficult fight.
|
| |  | Still heavy fire!
|
| |  | More Lines - Exterior Knocked goin In!
|
| |  | Overhaul and Rehab Time
|
| |  | Overhaul
|
| |
February 2009 Prairie Pedal Lane Residential Fire Page: |
1 |
|
|
| Picture Gallery |  |
| 2010 Call Volume |
| |
Fire |
EMS |
| January |
7 |
18 |
| February |
5 |
11 |
| March |
11 |
13 |
| April |
14 |
12 |
| May |
9 |
9 |
| June |
4 |
12 |
| July |
4 |
12 |
| August |
6 |
11 |
| September |
|
|
| October |
|
|
| November |
|
|
| December |
|
|
| Total |
60 | 98 |
View Call Volume History
|
|